Federal PortfolioFort Bliss Water System ImprovementsClient: Fort Worth District Corps of EngineersLocation: Fort Bliss, Texas Project Cost: $10.2 million Project Work tasks included new steel ground storage water reservoirs to replace existing concrete reservoir structures, replacement of system pumps along with JP8 fuel-driven engine drive standby units, replacement of several thousand feet of water line, and a complete overhaul of the water control system with a new SCADA and fiber optic setup. Innumerable problems were encountered during design because the existing water system was not in good shape—there were many previous design/construction errors Garver had to fix to make the system work. The project included 35%, 65%, and 100% review stages and Value Engineering requirements. Garver successfully completed the design and met the aggressive fast-track schedule deadline for this 36-site water SCADA system, three pump stations ranging from 200 HP to 500 Hp, and five system water tanks. Services Provided